PROJECT OVERVIEW.
Long Distance Microtunnelling Capability
The scope of works increased for Pezzimenti once works were started due to the difficulties encountered by other contractors and Pezzimenti’s ability to microtunnel long distances and so eliminate designed manhole structures.
Pezzimenti Tunnelbore completed 5 microtunnels, including 2 Freebores that were over 170+ metres (174m and 176m in Shale )
About the South West Growth Centre
The South West Growth Centre is approximately 17,000 hectares in size and includes parts of the Liverpool, Camden and Campbelltown local government areas. It is divided into 18 Precincts that are being progressively released for planning and rezoned for sustainable urban development.
The South West Growth Centre will be supported by a Major Centre at Leppington and be serviced by the new South West Rail Link. It will contain about 110,000 new dwellings for some 300,000 residents — almost the same population as Canberra.
Pipejacking Steel Outer Casing at Denham Road shaft.
Pipejacking 762 OD Steel Outer Casing Pipe beneath Camden Valley Way.
Sliplining a 450 GRP JP pipe into a Freebore.
A section of the structure plan for the South West Growth Centre.
Site Setup at the Camden Valley Way launch shaft. The container truck gantry is extended over the shaft allowing rods to be winched to the operator.
MICROTUNNEL 1.
Free Pipe by Freebore Method
Length. 174m
Diameter. 550
Ground. Shale
Casing Pipe. None
Carrier Pipe. 450 GRP JP
MICROTUNNEL 2.
Free Pipe by Freebore Method
Length. 176m
Diameter. 550
Ground. Shale
Casing Pipe. None
Carrier Pipe. 450 GRP JP
MICROTUNNEL 3.
Pipe in a Pipe by Pipejack Method
Length. 147m
Diameter. 630
Ground. Clay / Shale
Casing Pipe. 610 Steel
Carrier Pipe. 375 PP
MICROTUNNEL 4.
Pipe in a Pipe by Pipejack Method
Length. 82m
Diameter. 630
Ground. Clay/Shale
Casing Pipe. 610 OD Steel
Carrier Pipe. 375 PP
MICROTUNNEL 5.
Pipe in a Pipe by Pipejack Method
Length. 138m
Diameter. 780
Ground. Clay / Shale
Casing Pipe. 762 OD Steel
Carrier Pipe. 525 PP