PROJECT OVERVIEW.

The South West Growth Centre (SWGC) is a major NSW government priority to release land for residential development in order to ease Sydney’s chronic housing shortage. As part of these works Sydney Water are creating sewerage infrastructure including sewer carriers and sewerage pumping stations for the South West Growth Centre (SWGC). They awarded Zinfra the contract works – including the Bringelly Road, Camden Valley Way and Denham Road sewer carriers – and Zinfra engaged Pezzimenti Tunnelbore to complete a series of 5 microtunnels

SWGC Microtunneling Method Free Pipe

SWGC Microtunneling Diameter Length Ground

Long Distance Microtunnelling Capability

The scope of works increased for Pezzimenti once works were started due to the difficulties encountered by other contractors and Pezzimenti’s ability to microtunnel long distances and so eliminate designed manhole structures.

Pezzimenti Tunnelbore completed 5 microtunnels, including 2 Freebores that were over 170+ metres (174m and 176m in Shale )

About the South West Growth Centre

The South West Growth Centre is approximately 17,000 hectares in size and includes parts of the Liverpool, Camden and Campbelltown local government areas. It is divided into 18 Precincts that are being progressively released for planning and rezoned for sustainable urban development.

The South West Growth Centre will be supported by a Major Centre at Leppington and be serviced by the new South West Rail Link. It will contain about 110,000 new dwellings for some 300,000 residents — almost the same population as Canberra.

Microtunnelling SouthWest Growth Centre

Pipejacking Steel Outer Casing at Denham Road shaft.

Microtunnelling SouthWest Growth Centre

Pipejacking 762 OD Steel Outer Casing Pipe beneath Camden Valley Way.

Microtunnelling South West Growth Centre

Sliplining a 450 GRP JP pipe into a Freebore.

South West Growth Centre Plan

A section of the structure plan for the South West Growth Centre.

Microtunneling South West Growth Centre Site Setup

Site Setup at the Camden Valley Way launch shaft. The container truck gantry is extended over the shaft allowing rods to be winched to the operator.

MICROTUNNEL 1.

SWGC Microtunneling Free Pipe Method
Free Pipe by Freebore Method

Length. 174m
Diameter.  550
Ground.  Shale
Casing Pipe.  None
Carrier Pipe.  450 GRP JP

MICROTUNNEL 2.

SWGC Microtunneling Free Pipe Method
Free Pipe by Freebore Method

Length. 176m
Diameter.  550
Ground.  Shale
Casing Pipe. None
Carrier Pipe.  450 GRP JP

MICROTUNNEL 3.

SWGC Microtunneling Pipe in a Pipe
Pipe in a Pipe by Pipejack Method

Length. 147m
Diameter.  630
Ground.  Clay / Shale
Casing Pipe.  610 Steel
Carrier Pipe.  375 PP

MICROTUNNEL 4.

SWGC Microtunneling Pipe in a Pipe
Pipe in a Pipe by Pipejack Method

Length. 82m
Diameter.  630
Ground.  Clay/Shale
Casing Pipe.  610 OD Steel
Carrier Pipe.  375 PP

MICROTUNNEL 5.

SWGC Microtunneling Pipe in a Pipe
Pipe in a Pipe by Pipejack Method

Length. 138m
Diameter.  780
Ground.  Clay / Shale
Casing Pipe.  762 OD Steel
Carrier Pipe.  525 PP